Home / Projects

Our projects

Actions speak louder than words. Over 30 years of highway packages, airport works, barrages, and urban roads across Karnataka — a portfolio that underscores our commitment to quality, safety, sustainability, and efficient delivery.

Marquee projects

Key projects

Greenfield Airport at Vijayapura — approach and entrance
FLAGSHIP · DEVELOPMENT OF GREENFIELD

Airport at Vijayapura, Karnataka

Our flagship project — the Greenfield Airport development at Vijayapura, valued at ₹216 crore and commissioned by the Karnataka PWD and KSIIDC. This challenging project involves the construction of a runway, apron, taxiways, isolation bay, and extensive airside and cityside pavements, aiming to accommodate Airbus A320 or equivalent aircraft.

Its geological complexity demands high precision, vigilance, and expertise — including safe blasting activities in major areas — and our team is intensely focused on delivering before the stipulated deadline without compromise on safety, quality, or environmental standards.

Tender value ₹216 crore
Mudhol Bypass Road — completed four-lane carriageway
COMPLETED · DEVELOPMENT OF ROADS

Mudhol Bypass Road, Karnataka

We take immense pride in the successful completion of the Mudhol Bypass Road project — a 10-kilometre, four-lane bypass built to alleviate congestion in the town of Mudhol.

Delivering within the agreed time frame and budget, we received widespread appreciation for meticulous attention to quality, safety, and sustainability — one of an extensive portfolio of completed highway works across Karnataka.

10 km · Four-lane bypass
Flyover under construction on the NH-50 corridor
ONGOING · NHAI · EPC MODE

NH-50 Blackspot Rectification, Hungund–Hospet

Permanent rectification of accident blackspots on the Hungund–Hospet section of NH-50 for the National Highways Authority of India — a safety-critical EPC package covering vehicular overpasses at Basaveshwara Circle (Ilkal) and Metagal Cross, a flyover at Hulgi, a VUP at Hosahalli, an LVUP at Shahapur Cross, and an SVUP at the ROB approach, together with slip and service roads on both sides.

Each structure is engineered to separate local and highway traffic, eliminating identified accident-prone conflict points while keeping the national highway fully live throughout construction.

Tender value ₹138.99 crore · NHAI Bengaluru
In the news

Expanding into airport development, eyeing larger EPC projects

ANI News reports on S. S. Alur Construction Company's expansion into aerospace infrastructure and its growing pipeline of large-scale EPC highway and structural works across Karnataka.

ANI News · June 2026
Read article
Project register

Ongoing & completed works

DescriptionDepartmentTender amount (₹)
Development of Greenfield Airport for ATR-72 day VFR operation at Vijayapura — expansion from ATR-72 to Airbus A320 / equivalent aircraft (Package-1, WI 124803)PWD Vijayapura2,16,08,50,000
Widening to 2-lane with paved shoulders from Km 67+000 to 115+000 on Kadur–Hosadurga section of NH-173, EPC mode (RW/BNG/NH-173/Km 66.00-116.00/11/2022)NH Bengaluru1,84,90,00,000
Permanent rectification of blackspots — VOPs at Basaveshwara Circle (Ilkal) and Metagal Cross, flyover at Hulgi, VUP at Hosahalli, LVUP at Shahapur Cross, and SVUP at ROB approach with slip and service roads, Hungund–Hospet section of NH-50, EPC modeNHAI Bengaluru1,38,99,00,000
Improvements and development of Aycut Road under command area of Nagarabetta LIS, Muddebihal Taluk (KBJNL/2022-23/RD/WORK_INDENT23034)KBJNL ALBC Almatti50,82,70,840
Road upgradation packages — SH-148 via Sirigere & Manjerikoppa reaches, Koodligere–Kammaraghatta SH-115, and Bhadravathi–Sasivehalli SH reaches, Shivamogga District (Pkg-523)CE SHDP Bengaluru28,18,16,534
Improvements to Madhugiri–Hindupura SH-158 (Ch 0.00–5.50 Km) and Midigeshi–Chandandur MDR (Ch 0.00–5.50 Km), Madhugiri Taluk, Tumkur District (PKG-754)CE PIU SHDP Bengaluru25,38,96,615
Improvements to Hangaragi Cross–Kolhar–Baluti–Hanamapur MDR, Basavana Bagewadi Ingaleshwar MDR, and Ronihal–Malaghana–Kalagurthi–Managuli MDR (selected reaches), Package-675CE PIU SHDP Bengaluru25,17,50,023
Construction of roads (11 nos.) including RCC drains and CD works at Kolhar RC, Basavana Bagewadi Taluk (UKPRR/2022-23/OW/WORK_INDENT926)EE UKPR&R Div 2 Almatti25,01,60,000
Repair and extension of left bank training wall downstream of Almatti Dam — rehabilitation under World Bank–aided DRIP Phase-II, Package-IIIKBJNL Dam Div Almatti18,84,85,046
Construction of RCC culverts and bridge in NTPC ash pipe corridor with widening of road (Ch +18.00 to ~+22.00 Km), B. Bagewadi Taluka (8443 Deposit 2021-22)EE PWD Vijayapura15,86,50,410
Bridge-cum-barrage across Malaprabha river downstream of Cholachagudda Barrage, Badami Taluk — Package-4: extra right training wall, guide walls, return wall & 520 m approach roadEE KNNL MLBC Div 3 Badami4,93,26,455
Bridge-cum-barrage across Malaprabha river — Package-2: right bank abutment, NOF & body wall (Ch 0+116.54 m to 0+190 m)EE KNNL MLBC Div 3 Badami4,86,72,304
Bridge-cum-barrage across Malaprabha river — Package-1: left bank abutment, NOF & body wall (Ch 0+42.67 m to 0+116.54 m)EE KNNL MLBC Div 3 Badami4,85,42,778
Bridge-cum-barrage across Malaprabha river — Package-3: gated & ungated portion stilling basin, pitching, and left & right training wallsEE KNNL MLBC Div 3 Badami4,65,05,154
Bridge-cum-barrage across Malaprabha river — Package-5: extra left training wall, guide & return walls, FRP needle gates, store shed & 300 m approach roadEE KNNL MLBC Div 3 Badami3,70,44,484

Values as per tender amounts listed in the Company Profile 2024–25.

DescriptionDepartmentTender amount (₹)
Improvements to Chadachana–Kanura–Thidagundi MDR, Siddapura–Shiranala–Kannuru MDR, Chadchana–Havinal–Hathali–Loni(BK)–SH-41 joining road, and Nagthana–Rampura MDR (Pkg-403)CE SHDP Bengaluru43,04,07,901
Improvement to Mattihal–Malaghan–Masuti–Kudagi MDR up to NH-50 (Km 0.00–11.50) and Nalatawad–Mukihal MDR (Km 8.00–23.20), Vijayapura District (Pkg-402)CE SHDP Bengaluru33,20,88,586
Widening & improvements to nine MDR packages — Bijapur Ukkali–Balaganur Road, BasavanBagewadi Ingaleshwar Road, NH-13 to Nidagundi Basarakod, Hadagali–Satihal, Kolhar–Garasangi–Ronihal, and Mattihal–Malghan–Masuti–Kudagi reaches, Basavan Bagewadi TalukaEE PWD Vijayapura23,91,56,000
Improvements to Shirdon–Lingsugur (SH-41) reaches Km 151.50–155.00, 158.25–161.00 and 161.00–163.75, Muddebihal Taluk (Package-1)EE PWD Vijayapura17,31,64,000
Widening & improvements — BasavanBagewadi Nidagundi Road, Masabinal Road, Ingaleshwar Road, and Masibanal–Donur–Neginal reaches, BasavanBagewadi Taluka (Appendix-E, 2017-18)EE PWD Vijayapura16,50,85,000
Construction of link road from APMC–Muchakandi road to Bagalkot–Badami District Main Road for Unit-III of Navanagar, BagalkotBTDA Bagalkot15,44,78,029
Construction of barrage across Malaprabha river near Mangalagudda village, Guledgudda Taluk, Bagalkot DistrictEE MI Div Vijayapura10,35,33,274
Improvements of road from UKP Cross to Balluti–Hanamapur (via Balluti village), Ch 0.00–8.00 Km, Basavan Bagewadi TalukaKBJNL MLI Div 1 Mattihal6,63,44,455
Improvements to road from SH-124 to pump house of Old Baluti village, B. Bagewadi TalukaKBJNL MLI Div 1 Mattihal5,92,80,480
Providing CC roads, drains & connected colony roads in SC colonies of Masuti-1, Masuti-2 and Mudur-2 villages, Muddebihal Taluka (Package-4)EE PWD Vijayapura5,49,70,747
CC roads & essential works — Gundanapalle RC SC Colony, Bennur SC Colony, Jadramkunti village & Bhagavati village approach road, Bagalkote Taluk (H/A 5054 SCP 2019-20)EE PWD Bagalkot5,23,41,529
Asphalting of Manahalli–Sangam MDR (Domanal Cross) to SC Colony approach, Rampur SC Colony CC road & drainage, and Seetimani LT approach, Bagalkote TalukEE PWD Bagalkot5,23,74,240
CC approach roads and drainage to SC colonies from NH-50 in Hungund Town, Sankeshwar–Sangam SH-44 to Old Sangam SC Colony, and Alampur Pet Waddar Galli, Ilkal City (Package-I)EE PWD Bagalkot5,22,56,774
Development of roads at Vijayapura District Hospital campus — CC roads, asphalt roads & footpaths across six sub-works (Package 01)City Municipality Vijayapura4,99,08,699
Improvements to road from Jevaragi–Chikkodi Km 4.95 to 6.65, Sindagi Taluka (H/A 5054 MDR & Others, Appendix-E)EE PWD Vijayapura4,92,46,933
Improvement to arterial and ward roads in Mallikarjuna Nagar, Adarsha Nagar, and Nandini Badavane areas of Vijayapura City (Package 05)City Municipality Vijayapura4,91,59,354
Improvements to Aurad–Sadashivgad SH-34, Km 369.76–376.00, Jamkhandi Taluk (H/A 5054 SH Improvement 2018-19)EE PWD Bagalkot4,58,23,337
CC road & drainage works joining ST colonies at Neeralakeri, Billkerur & Bevoor villages, Bagalkote Taluk (H/A 5054 TSP 2019-20)EE PWD Bagalkot4,19,00,884
Improvements to Kavalagi–Ukumanal–Katnalli, Hegadihal–Kathnalli, and Handaragal approach roads, Vijayapura & Muddebihal Taluks (MDR Maintenance 2018-19)EE PWD Vijayapura3,09,27,451
Safety metal beam crash barriers for service road & inspection path, Ch 0.00–4.00 Km and 4.00–8.465 Km of lead-off Canal-2, UKP Stage-IIIEE KBJNL MLI Div 1 Mattihal4,42,60,680
Comprehensive development of CC roads to ST colonies in Guggalamari, Upanal, Chikkayarankeri & Bheemanagada villages and Ilkal City, Hungund TalukaEE PWD Bagalkot2,09,31,079
Repair & rehabilitation of bridge near Chikkapadasalagi Krishna bridge on Aurad–Sadashivgad SH-34 — guniting, grouting, epoxy mortar plaster & approach widening, Jamkhandi TalukEE PWD Bagalkot72,12,253

Selected closed works from the last five years, as listed in the Company Profile 2024–25. Complete work-completion certificates available on request.

Financial performance

The strength to deliver

Consistent year-on-year growth, healthy banking relationships, and the working-capital depth to execute contracts in excess of ₹200 crore.

As an established partnership firm with three decades of continuous operation, our balance sheet reflects steady turnover growth driven by a widening portfolio of EPC and departmental works. CMA data, provisional and projected balance sheets, and solvency documentation are available to departments and financial institutions on request.

Documentation available

Financials
Audited statements & CMA data
Registrations
PWD Class-I · GST · Udyam/MSME
Certifications
ISO 9001 / 14001 / 45001
Track record
Work-done & completion certificates
Download Company Profile (PDF)